000 -LEADER |
fixed length control field |
01789naa a2200217uu 4500 |
001 - CONTROL NUMBER |
control field |
11306 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20190211155404.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
030219s2006 xx ||||gr |0|| 0 eng d |
999 ## - SYSTEM CONTROL NUMBERS (KOHA) |
Koha Dewey Subclass [OBSOLETE] |
PHL2MARC21 1.1 |
041 ## - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
100 1# - MAIN ENTRY--PERSONAL NAME |
Personal name |
ELKJAER, Martin |
9 (RLIN) |
3214 |
245 10 - TITLE STATEMENT |
Title |
Stochastic budget simulation |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Date of publication, distribution, etc. |
apr. 2000 |
520 3# - SUMMARY, ETC. |
Summary, etc. |
The purpose of this article is to present a new method for cost estimation. The innovative idea is to combine the conventional calculation method stochastic simulation with basic facets of the successive principle. The purpose of this is to avoid the assessment of dependencies between cost items in the budget. The method is named Stochastic Budget Simulation (SBS), and it is made operational with a software application. The method can be applied to most projects with a simple cost structure at the early stages where uncertainty plays a significant role in estimating the overall cost. The most likely users are planners, project managers or consultants. It is not necessary to understand the calculations, the statistical theory or the simulation technique in order to use the method. However, users should be able to arrange items and overall influences in accordance with the urgent requirement of statistical independence. SBS is a new and radically different way to analyse and evaluate the economic consequences of large-scale projects by quantifying intervals for cost items and using simulation as tool to represent distributions of the possible costs |
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Cost Estimation |
9 (RLIN) |
12529 |
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Stochastic Simulation |
9 (RLIN) |
20156 |
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Uncertainty Analysis |
9 (RLIN) |
20157 |
773 08 - HOST ITEM ENTRY |
Title |
International Journal of Project Management |
Related parts |
18, 2, p. 139-147 |
Place, publisher, and date of publication |
, apr. 2000 |
Record control number |
|
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Koha item type |
Periódico |
998 ## - LOCAL CONTROL INFORMATION (RLIN) |
-- |
20030219 |
Operator's initials, OID (RLIN) |
Lucima |
Cataloger's initials, CIN (RLIN) |
Lucimara |
998 ## - LOCAL CONTROL INFORMATION (RLIN) |
-- |
20060801 |
Operator's initials, OID (RLIN) |
1545^b |
Cataloger's initials, CIN (RLIN) |
Quiteria |