<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › MARC details for record no. 12032

Substantiation and assessment of claims for extensions of time (Record no. 12032)

000 -LEADER
fixed length control field 01762naa a2200229uu 4500
001 - CONTROL NUMBER
control field 11910
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190211155710.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 030415s2006 xx ||||gr |0|| 0 eng d
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha Dewey Subclass [OBSOLETE] PHL2MARC21 1.1
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name KUMARASWAMY, M. M
9 (RLIN) 20478
245 10 - TITLE STATEMENT
Title Substantiation and assessment of claims for extensions of time
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Name of publisher, distributor, etc. The International Project Management Association,
Date of publication, distribution, etc. 2003
520 3# - SUMMARY, ETC.
Summary, etc. Standard forms of contract provide for extensions of time (EOT) due to excusable delays, and EOT claims are common in many construction projects. The contractor and the supervising engineer often spend considerable time on substantiating and assessing such claims. However, a variety of diverse techniques have been employed for such evaluations. A study was undertaken to analyse different EOT evaluation techniques in Hong Kong, which continues to be a hotbed of construction activity attracting international organisations. Reasons for delays in the submission and assessment of EOT were also probed. Conclusions on the suitability of different techniques are drawn from a analysis of both the literature revied and a consolidation of practitioner perceptions, as derived from a questionnaire survey and subsequent in depth interviews. This leads to recommendadations for explicit policies, clear guidelines, tool-kits and improved contractual procedures that will upgrade the management of this crucial area
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Claims
9 (RLIN) 17983
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Extensions of Time
9 (RLIN) 20479
651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Hong Kong
9 (RLIN) 15843
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name YOGESWARAN, K
9 (RLIN) 20480
773 08 - HOST ITEM ENTRY
Title International Journal of Project Management
Related parts 21, 1, p. 27-38
Place, publisher, and date of publication The International Project Management Association, 2003
Record control number
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Periódico
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20030415
Operator's initials, OID (RLIN) Karen
Cataloger's initials, CIN (RLIN) Karen
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20060405
Operator's initials, OID (RLIN) 0846^b
Cataloger's initials, CIN (RLIN) Quiteria
Holdings
Status de empréstimo Status de perda Status de danificação Restrição de uso Não pode ser emprestado Código da coleção Localização permanente Localização atual Data de aquisição Date last seen Preço efetivo a partir de Tipo de material
          Periódico Biblioteca Graciliano Ramos Biblioteca Graciliano Ramos 2017-09-28 2017-09-28 2017-09-28 Periódico

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha