<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › MARC details for record no. 39640

A case study into the language structure of construction standard form in Malaysia (Record no. 39640)

000 -LEADER
fixed length control field 02087naa a2200253uu 4500
001 - CONTROL NUMBER
control field 1060714181837
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190211175313.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110607s2010 xx ||||gr |0|| 0 eng d
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha Dewey Subclass [OBSOLETE] PHL2MARC21 1.1
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name CHONG, Heap-Yih
9 (RLIN) 44948
245 10 - TITLE STATEMENT
Title A case study into the language structure of construction standard form in Malaysia
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Oxford :
Name of publisher, distributor, etc. Elsevier,
Date of publication, distribution, etc. aug. 2010
520 3# - SUMMARY, ETC.
Summary, etc. Different interpretation could denote a dispute regarding the contractual obligations and expectation between the contracting parties. This paper addresses the need for clarity of standard form in Malaysia. Hence the objectives are to identify the problems in the language structure of standard form from the viewpoint of professionals, and the measures for improving the language structure of standard form. The research aims to mitigate or prevent construction disputes through better interpretation and understanding of construction contracts, and it offers a proactive approach to avoid the inevitability of conflicts occurring in a project. The data collection was mainly by questionnaire survey. Two experts from construction contracting were appointed to approve the questionnaire design and verify the research outcomes. The results identified eight clarity aspects and three legalese problems of language structure in PWD 203A (Rev. 10/83) Form. Besides, twelve out of thirteen measures were agreed upon by the respondents as to ways for improving the language structure. It is concluded that clarity needs to be considered in future contract drafting towards the understanding of standard forms, and thereby to contribute to the avoidance of disputes
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gestão de Contratos
9 (RLIN) 13064
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gestão de Conflitos
9 (RLIN) 13007
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Padronização
9 (RLIN) 14055
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Segundo Setor
9 (RLIN) 19108
651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Malásia
9 (RLIN) 14108
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name ZIN, Rosli Mohamad
9 (RLIN) 44949
773 08 - HOST ITEM ENTRY
Title International Journal of Project Management
Related parts 28, 6, p. 601-608
Place, publisher, and date of publication Oxford : Elsevier, aug. 2010
International Standard Serial Number ISSN 02637863
Record control number
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Periódico
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20110607
Operator's initials, OID (RLIN) 1418^b
Cataloger's initials, CIN (RLIN) Daiane
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20110805
Operator's initials, OID (RLIN) 1332^b
Cataloger's initials, CIN (RLIN) Keicielle

No items available.

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha