<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › MARC details for record no. 39652

Labour-intensive construction sub-contractors : (Record no. 39652)

000 -LEADER
fixed length control field 02328naa a2200265uu 4500
001 - CONTROL NUMBER
control field 1060715264437
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190211175324.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110607s2010 xx ||||gr |0|| 0 eng d
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha Dewey Subclass [OBSOLETE] PHL2MARC21 1.1
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name NG, S. Thomas
9 (RLIN) 39188
245 10 - TITLE STATEMENT
Title Labour-intensive construction sub-contractors :
Remainder of title their critical success factors
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Oxford :
Name of publisher, distributor, etc. Elsevier,
Date of publication, distribution, etc. oct. 2010
520 3# - SUMMARY, ETC.
Summary, etc. What contributes to the success of sub-contractors is a key concern of the construction industry as the performance of sub-contracting firms is far from satisfactory. While certain studies have been carried out to examine the critical success factors (CSFs) for sub-contractors, it is unrealistic to assume that these CSFs are relevant to all types of sub-contractors. Hence, the purpose of this paper is to establish a set of CSFs for those construction sub-contractors which are labour-intensive in nature. To achieve that, a self-administered questionnaire survey was conducted in Hong Kong. A set of CSFs pertinent to labour-intensive sub-contractors are first identified through descriptive statistics. The CSFs are then compared with those pertinent to equipment-intensive trade specialists. Finally, the identified CSFs are grouped into three components through a factor analysis. Through the survey, nine factors are identified as critical to the success of labour-intensive sub-contractors, and these CSFs are grouped into three components viz. the managerial performance, financial performance, and labour-intensive specific factors. The findings of this study provide a good basis for labour-intensive sub-contractors to improve their success at project and organisational levels. The identified CSFs will also provide a solid foundation for future research into the key performance indicators and benchmarks for labour-intensive sub-contractors
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gestão de Contratos
9 (RLIN) 13064
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Indicador de Desempenho
9 (RLIN) 14201
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Avaliação de Desempenho
9 (RLIN) 12937
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gestão de Projetos
9 (RLIN) 13021
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Técnica Administrativa
9 (RLIN) 12835
651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name China
9 (RLIN) 13345
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name TANG, Ziwei
9 (RLIN) 39189
773 08 - HOST ITEM ENTRY
Title International Journal of Project Management
Related parts 28, 7, p. 732-740
Place, publisher, and date of publication Oxford : Elsevier, oct. 2010
International Standard Serial Number ISSN 02637863
Record control number
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Periódico
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20110607
Operator's initials, OID (RLIN) 1526^b
Cataloger's initials, CIN (RLIN) Daiane
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20110809
Operator's initials, OID (RLIN) 0940^b
Cataloger's initials, CIN (RLIN) Keicielle

No items available.

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha