<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › MARC details for record no. 7490

Compressing construction durations : (Record no. 7490)

000 -LEADER
fixed length control field 02694naa a2200253uu 4500
001 - CONTROL NUMBER
control field 7337
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190211154240.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 020927s2005 xx ||||gr |0|| 0 eng d
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha Dewey Subclass [OBSOLETE] PHL2MARC21 1.1
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name CHAN, Daniel W. M
9 (RLIN) 2102
245 10 - TITLE STATEMENT
Title Compressing construction durations :
Remainder of title lessons learned from Hong Kong building projects
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2002
520 3# - SUMMARY, ETC.
Summary, etc. This paper explores explanations for possible causative pattern and suggestions for strategies to compress the construction duractions of various types of building projects, on the basis of the lessons learned from recent Hong Kong - based surveys and research findings. A review of the literature from different countries is first provided - on the factors affecting construction durations, reasons for project delays and existing statistical models for duration forecasts. This is followed by the presentation of a regression-based model - developed from Hong Kong public housing construction projet data - for predicting the durations of the primary work packages in the building process and the overall completion period. Finally, the principal survey results of three paralellel investigations which sought out the critical contributors to faster construction in Hong Kong within each of three different building sub-sectors - public housing, public non-residential buildings and private sector buildings - are presented and discussed. Both similarities and differences are noted among the many perceived important contributory factors and factor categories, across the various types of industry practitioners, i.e. clients, consultants and contractors. Based on the factors identified as significant from the above recent research findings, specific technological and managerial strategies for reducing construction periods (increasing construction speed) in particular building sub-sectors are formulated in order to improve the construction time performance of local building projects. The research methodology develped for the reported investigations can well be extended to similar studies in other sub-sectors in Hong Kong, as well as in other countries for international comparisons - so as to expand our existing body of knowledge of the critical success factors in compressing the building construction process
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction Durations
9 (RLIN) 16804
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project Delays
9 (RLIN) 16805
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Prediction Models
9 (RLIN) 16806
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Faster Construction
9 (RLIN) 16807
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Hong Kong
9 (RLIN) 15843
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name KUMARASWAMY, Mohan M
9 (RLIN) 16808
773 08 - HOST ITEM ENTRY
Title International Journal of Project Management
Related parts 20, 1, p. 23-35
Place, publisher, and date of publication , 2002
Record control number
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Periódico
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20020927
Operator's initials, OID (RLIN) Lucima
Cataloger's initials, CIN (RLIN) Lucimara
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20070307
Operator's initials, OID (RLIN) 1309^b
Cataloger's initials, CIN (RLIN) Natália
Holdings
Status de empréstimo Status de perda Status de danificação Restrição de uso Não pode ser emprestado Código da coleção Localização permanente Localização atual Data de aquisição Date last seen Preço efetivo a partir de Tipo de material
          Periódico Biblioteca Graciliano Ramos Biblioteca Graciliano Ramos 2017-09-27 2017-09-27 2017-09-27 Periódico

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha