<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › MARC details for record no. 7499

A simulation model for multi-project resource allocation (Record no. 7499)

000 -LEADER
fixed length control field 01810naa a2200241uu 4500
001 - CONTROL NUMBER
control field 7346
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190211154241.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 020927s2005 xx ||||gr |0|| 0 eng d
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha Dewey Subclass [OBSOLETE] PHL2MARC21 1.1
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name GHOMI, S.M.T. Fartemi
9 (RLIN) 4043
245 10 - TITLE STATEMENT
Title A simulation model for multi-project resource allocation
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2002
520 3# - SUMMARY, ETC.
Summary, etc. There are limited solution techniques available for resource constrained single project sheduling with stochastic task durations. Due to computacional complexity, optimal solution or heuristics for sheduling have been found useful for large deterministic problems. This complexity is more and more for common resource constraint with multi-projects (parallel projects). The main objective of this problem is sheduling the projects as soon as possible with better utilization of common available resource constraint. This paper considers the problem of multi-project resource allocation (MPRA) as a multi-channel queuing system. Simulation modelling has been used to solve the MPRA problem. This paper demonstartes a framework and a procedure with use of a general purpose simulation language like GPSS's blocks to generate a simulation model. Then to show how to model works, a numerical example is given and statistical results are recorded. The model has the capability to obtain the complection time distribution function for each project, througput time (makespan) and consumed resource distribution
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Resource Allocation
9 (RLIN) 12604
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Scheduling Projects
9 (RLIN) 16841
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Simulation Modelling
9 (RLIN) 16842
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Multi-project
9 (RLIN) 16843
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name ASHJARI, B
9 (RLIN) 16844
773 08 - HOST ITEM ENTRY
Title International Journal of Project Management
Related parts 20, 2, p. 127-130
Place, publisher, and date of publication , 2002
Record control number
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Periódico
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20020927
Operator's initials, OID (RLIN) Lucima
Cataloger's initials, CIN (RLIN) Lucimara
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20060515
Operator's initials, OID (RLIN) 1444^b
Cataloger's initials, CIN (RLIN) Quiteria
Holdings
Status de empréstimo Status de perda Status de danificação Restrição de uso Não pode ser emprestado Código da coleção Localização permanente Localização atual Data de aquisição Date last seen Preço efetivo a partir de Tipo de material
          Periódico Biblioteca Graciliano Ramos Biblioteca Graciliano Ramos 2017-09-27 2017-09-27 2017-09-27 Periódico

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha