000 -LEADER |
fixed length control field |
02151nam a2200217uu 4500 |
001 - CONTROL NUMBER |
control field |
648 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20190211154035.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
001010s1999 xx ||||g| |0|| 0 eng d |
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
2.20 |
Local cutter number (OCLC) ; Book number/undivided call number, CALL (RLIN) |
T231a |
999 ## - SYSTEM CONTROL NUMBERS (KOHA) |
Koha Dewey Subclass [OBSOLETE] |
PHL2MARC21 1.1 |
041 ## - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
100 1# - MAIN ENTRY--PERSONAL NAME |
Personal name |
TAVARES, Luis Valadares |
9 (RLIN) |
13335 |
245 10 - TITLE STATEMENT |
Title |
Advanced models for project management |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Boston : |
Name of publisher, distributor, etc. |
Kluwer Academic Publishers, |
Date of publication, distribution, etc. |
1999 |
300 ## - PHYSICAL DESCRIPTION |
Extent |
309 p. |
490 0# - SERIES STATEMENT |
Series statement |
International Series in Operations Research & Management Science ; |
Volume/sequential designation |
16 |
505 80 - FORMATTED CONTENTS NOTE |
Title |
1. A systemic introduction to project management |
-- |
1. Projects and organizations |
-- |
2. Project management and model building |
-- |
3. The general systemic model |
-- |
4. The systemic model of project management |
-- |
2. Basic models for project management |
-- |
1. Project networking |
-- |
2. Sequentiality |
-- |
3. Resources |
-- |
4. Duration |
-- |
5. Optimal scheduling |
-- |
3. Structural modelling of projects networks |
-- |
1. Hardness and complexity |
-- |
2. Modular decomposition |
-- |
3. Network reduction |
-- |
4 - Hierarchical levels |
-- |
5. Level adjacency matrix |
-- |
4. Morphology and simulation of project networks |
-- |
1. Morphology |
-- |
2. The generation method |
-- |
3. Comparative analysis |
-- |
4. A test set of generated networks |
-- |
5. Duration of projects |
-- |
1. Modellling |
-- |
2. Experimental results |
-- |
6. Scheduling of project networks |
-- |
1. General formulation and typology |
-- |
2. The binary formulation |
-- |
3. The heuristic optimization of the binary model |
-- |
4. The proposed non-linear continous model |
-- |
5. An application of the proposed model using RISKNET and GAMS-MINOS |
-- |
6 - Dynamic programming |
-- |
7 - Risk |
-- |
7. The assessment and evaluation of projects |
-- |
1. Typology |
-- |
2. Financial assessment and evaluation |
-- |
3. Multi-criteria assessment or evaluation |
-- |
4. The MACMODEL |
-- |
8. The optimal scheduling of a project in terms of its duration |
-- |
1. The synthesis of decision variables |
-- |
2. A theorem on the propagation of floats |
-- |
3. The developed stochastic model of the project network |
-- |
4. The results |
-- |
5. Conclusions |
-- |
Annex 1. Developed software |
-- |
1. RISKNET |
-- |
2. MACMODEL |
-- |
References |
-- |
INDEX |
650 #4 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name entry element |
Gestão de Projetos |
9 (RLIN) |
13021 |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Koha item type |
Livro Geral |
998 ## - LOCAL CONTROL INFORMATION (RLIN) |
-- |
20001010 |
Operator's initials, OID (RLIN) |
Maria |
Cataloger's initials, CIN (RLIN) |
Maria do Carmo Raphael |
998 ## - LOCAL CONTROL INFORMATION (RLIN) |
-- |
20160310 |
Operator's initials, OID (RLIN) |
1151^b |
Cataloger's initials, CIN (RLIN) |
Larissa |