<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › MARC details for record no. 9045

An efficient method for scheduling construction projects with resource constraints (Record no. 9045)

000 -LEADER
fixed length control field 01571naa a2200205uu 4500
001 - CONTROL NUMBER
control field 8900
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190211154556.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 021203s2005 xx ||||gr |0|| 0 eng d
999 ## - SYSTEM CONTROL NUMBERS (KOHA)
Koha Dewey Subclass [OBSOLETE] PHL2MARC21 1.1
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name ABEYASHINGHE, M. Chelaka L
9 (RLIN) 31
245 10 - TITLE STATEMENT
Title An efficient method for scheduling construction projects with resource constraints
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2001
520 3# - SUMMARY, ETC.
Summary, etc. In construction scheduling, conflicts can arise when activities require common resources that are availabel only in limited quantities. To overcome this, while retaining minimum project durations, mathematical techniques have been developed for allocating resources. However, these produce a "hard" inflexible approach to resource-constrained schedules. The authors propose an efficient resource allocation algorithm (LINRES) which offers a more flexible approach. To study its performance, an experiment was contucted on 10 small network examples (6 to 29 activities) and the results were compared with those generated by a total of 32 existing heuristic rules. The results shows that the LINRES algorithm outperformed most other heuristic rules, including the widely used MINSLK rule in both single - and multi-resource networks. It also provides a reasonable trade-off between the resource-aggregation profiles and the durations
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name GREENWOOD, David J
9 (RLIN) 18124
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name JOHANSEN, D. Eric
9 (RLIN) 18125
773 08 - HOST ITEM ENTRY
Title International Journal of Project Management
Related parts 19, 1, p. 29-45
Place, publisher, and date of publication , 2001
Record control number
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Periódico
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20021203
Operator's initials, OID (RLIN) Cassio
Cataloger's initials, CIN (RLIN) Cassio
998 ## - LOCAL CONTROL INFORMATION (RLIN)
-- 20060718
Operator's initials, OID (RLIN) 1152^b
Cataloger's initials, CIN (RLIN) Quiteria
Holdings
Status de empréstimo Status de perda Status de danificação Restrição de uso Não pode ser emprestado Código da coleção Localização permanente Localização atual Data de aquisição Date last seen Preço efetivo a partir de Tipo de material
          Periódico Biblioteca Graciliano Ramos Biblioteca Graciliano Ramos 2017-09-27 2017-09-27 2017-09-27 Periódico

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha