<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › Details for: Contractual methods for dispute avoindance and resolution (DAR)
Normal view MARC view ISBD view

Contractual methods for dispute avoindance and resolution (DAR)

Contributor(s): .
Material type: materialTypeLabelArticlePublisher: feb. 2000Subject(s): Contrato | Disputa | Projetos Industriais | Saudi ArabiaInternational Journal of Project Management 18, 1, p. 41-49Abstract: This paper discusses the appropriateness of contractual methods towards disputes avoindance and resolution (DAR) for industrial projects in Saudi Arabia. It focuses of the private industrial sector in the Eastern Province. A survey was conducted using the principles of quota sampling where 93 questionnaires were distributed to 11 owners, 59 contractors and 23 consultants. The survey consisted of 20 statements that measured the parties' attitude and opinion towards contractual methods recommended for dispute avoindance and resolution (DAR) during the construction phase. Respondents indicated their level of agreement on a 5 level scale. The result reflect the appropriateness of these techniques for industrial projects. The five contract administration methods for dispute avoindance and resolution (DAR) covered in this study are: Allocating Fair Contract Risk, Drafting Dispute Clauses, Team BuildingAbstract: Provision of a Neutral Arbitrator, and Binding Arbitration
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode
Periódico Biblioteca Graciliano Ramos
Periódico Not for loan

This paper discusses the appropriateness of contractual methods towards disputes avoindance and resolution (DAR) for industrial projects in Saudi Arabia. It focuses of the private industrial sector in the Eastern Province. A survey was conducted using the principles of quota sampling where 93 questionnaires were distributed to 11 owners, 59 contractors and 23 consultants. The survey consisted of 20 statements that measured the parties' attitude and opinion towards contractual methods recommended for dispute avoindance and resolution (DAR) during the construction phase. Respondents indicated their level of agreement on a 5 level scale. The result reflect the appropriateness of these techniques for industrial projects. The five contract administration methods for dispute avoindance and resolution (DAR) covered in this study are: Allocating Fair Contract Risk, Drafting Dispute Clauses, Team Building

Provision of a Neutral Arbitrator, and Binding Arbitration

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha