Risk management in the Lusoponte concession—a case study of the two bridges in Lisbon, Portugal

By: Teresa de Lemos.
Contributor(s): David Eaton | Martin Betts | Luis Tadeu de Almeida.
Material type: materialTypeLabelArticlePublisher: Nijkerk : Elsevier, 2004International Journal of Project Management 22, 1, p. 63-73Abstract: The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
No physical items for this record

The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha