<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › Details for: Key project management practices affecting Singaporean firms’ project performance in China
Normal view MARC view ISBD view

Key project management practices affecting Singaporean firms’ project performance in China

By: LING, Florence Yean Yng...[et al].
Material type: materialTypeLabelArticlePublisher: Elsevier, jan.2009International Journal of Project Management 27, 1, p. 59-71Abstract: Foreign (non-mainland Chinese) architectural, engineering and construction (AEC) firms may face difficulties managing construction projects in China because they are unfamiliar with this new operating environment. This study investigates project management (PM) practices adopted by Singaporean AEC firms in China. It determines the performance level of their projects in China; identifies PM practices that led to better performance; and recommends key PM practices that could be adopted by foreign AEC firms in China to achieve project success. A structured questionnaire was designed and data were collected via a self-administered postal and email survey, targeting Singaporean AEC firms that had undertaken and managed projects in China. The study finds that certain PM practices do indeed affect project performance. The most important of these are practices relating to scope management, such as controlling the quality of the contract document, quality of response to perceived variations and extent of changes to the contract. It is recommended that foreign firms adopt some of the PM practices highlighted in this study to help them achieve better project performance in China.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
No physical items for this record

Foreign (non-mainland Chinese) architectural, engineering and construction (AEC) firms may face difficulties managing construction projects in China because they are unfamiliar with this new operating environment. This study investigates project management (PM) practices adopted by Singaporean AEC firms in China. It determines the performance level of their projects in China; identifies PM practices that led to better performance; and recommends key PM practices that could be adopted by foreign AEC firms in China to achieve project success. A structured questionnaire was designed and data were collected via a self-administered postal and email survey, targeting Singaporean AEC firms that had undertaken and managed projects in China. The study finds that certain PM practices do indeed affect project performance. The most important of these are practices relating to scope management, such as controlling the quality of the contract document, quality of response to perceived variations and extent of changes to the contract. It is recommended that foreign firms adopt some of the PM practices highlighted in this study to help them achieve better project performance in China.

General: Managing projects, Success and strategy; Contractual: International projects

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha