<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › Details for: From hero to hubris – Reconsidering the project management of Heathrow’s Terminal 5
Normal view MARC view ISBD view

From hero to hubris – Reconsidering the project management of Heathrow’s Terminal 5

By: BRADY, Tim.
Contributor(s): DAVIES, Andrew.
Material type: materialTypeLabelArticlePublisher: Oxford : Elsevier, feb. 2010Subject(s): Gestão de Projetos | Modelo de Gestão | ImplementaçãoInternational Journal of Project Management 28, 2, p. 151-157Abstract: Heralded as the first stage in the regeneration of Heathrow Airport leading up to the 2012 Olympics, the construction of Terminal 5 had bucked the trend. In a world where most mega infrastructure projects fail, the T5 project was not only on schedule, it was on budget. At its official opening by the Queen it was being trumpeted as the 21st century gateway to Britain. But multiple problems emerged on the opening day culminating in the cancellation of numerous flights and thousands of lost bags requiring manual sorting before being returned to their owners. What should have been an occasion for celebration turned into a national disaster. Using accounts drawn from the media, from a House of Commons Transport Committee report and material from research into the construction phase of the project, this paper examines the episode via two theoretical lenses – normal accident theory and high reliability theory
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
No physical items for this record

Heralded as the first stage in the regeneration of Heathrow Airport leading up to the 2012 Olympics, the construction of Terminal 5 had bucked the trend. In a world where most mega infrastructure projects fail, the T5 project was not only on schedule, it was on budget. At its official opening by the Queen it was being trumpeted as the 21st century gateway to Britain. But multiple problems emerged on the opening day culminating in the cancellation of numerous flights and thousands of lost bags requiring manual sorting before being returned to their owners. What should have been an occasion for celebration turned into a national disaster. Using accounts drawn from the media, from a House of Commons Transport Committee report and material from research into the construction phase of the project, this paper examines the episode via two theoretical lenses – normal accident theory and high reliability theory

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha