<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › Details for: Risk and its management in the Kuwaiti construction industry :
Normal view MARC view ISBD view

Risk and its management in the Kuwaiti construction industry : a contractors` perspective

By: KARTAM, Nabil A.
Contributor(s): KARTAM, Saied A.
Material type: materialTypeLabelArticlePublisher: 2001International Journal of Project Management 19, 6, p. 325-335Abstract: This paper reports - on the basis of a questionnaire survey of the larges Kuwaiti contractors - a perspective of construction risk, and the effective actions taken for the management of such risks, particularly those of time and finances. The study, the first in Kuwait, focuses on the assesment, allocation and management of construction risks. The paper also presents two types of risk management methods: preventive, which are effective at the early stages of the project life, and mitigative, which are remedial actions aimed at risk minimization during construction. The research found that contractors show more willingness to accept risks that are contractual and legal-related rather than other types of risks. The research results also indicated that the application of the formal risk analysis techniques in the Kuwait construction industry is limited
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode
Periódico Biblioteca Graciliano Ramos
Periódico Not for loan

This paper reports - on the basis of a questionnaire survey of the larges Kuwaiti contractors - a perspective of construction risk, and the effective actions taken for the management of such risks, particularly those of time and finances. The study, the first in Kuwait, focuses on the assesment, allocation and management of construction risks. The paper also presents two types of risk management methods: preventive, which are effective at the early stages of the project life, and mitigative, which are remedial actions aimed at risk minimization during construction. The research found that contractors show more willingness to accept risks that are contractual and legal-related rather than other types of risks. The research results also indicated that the application of the formal risk analysis techniques in the Kuwait construction industry is limited

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha