000 01339naa a2200169uu 4500
001 5122016141417
003 OSt
005 20190211160434.0
008 051220s2005 xx ||||gr |0|| 0 eng d
100 1 _aTerje I. Vaaland
_922873
245 1 0 _aImproving project collaboration :
_bstart with the conflicts
260 _aNijkerk :
_bElsevier,
_c2004
520 3 _aThe paper aims at exploring how collaboration between clients and major contractors can be improved in situations where tension is challenging relationship continuation. Relationship conflict is reduced through the identification of conflictual events and analysis of differences in both parties' perceptions. By addressing these events it is possible to reveal the underlying dimensions of tension and reluctance for relationship commitment and trust. In order to improve the level of collaboration a process is tested on a Norwegian construction project. The managerial implications of the process is that tension between the contractor and the client can be reduced to a level where the relationship can survive, and even grow stronger than prior to undertaking the process
773 0 8 _tInternational Journal of Project Management
_g22, 6, p. 447-454
_dNijkerk : Elsevier, 2004
_xISSN 0263-7863
_w
942 _cS
998 _a20051220
_b1614^b
_cAnaluiza
999 _aConvertido do Formato PHL
_bPHL2MARC21 1.1
_c14437
_d14437
041 _aeng