000 02052naa a2200217uu 4500
001 0032410505937
003 OSt
005 20190211170634.0
008 100324s2009 xx ||||gr |0|| 0 eng d
100 1 _aSICHOMBO, B.
_939167
245 1 0 _aThe need for technical auditing in the Zambian construction industry
260 _aExeter, UK :
_bElsevier,
_cNovember 2009
520 3 _aAs economic crimes such as fraud, bid-rigging, bribery, collusion, coercion and extortion in the construction industry have increased worldwide, so has the fight against them taken centre stage. To uphold the high ethical standards required in the industry, stakeholders need to introduce and promote proactive strategies such as technical auditing to minimise or prevent unethical practices in the construction industry. This paper outlines the need and benefits of technical auditing in the Zambian construction industry. It presents results of a self-administered questionnaire survey in the construction industry in Zambia. The study established that the pre-contract stage was more susceptible to unethical crimes than the post-contract stage, making the appointment of technical auditors at planning stage more appropriate. The highest ranked benefit of technical auditing was found to be client confidence, followed by enhanced accountability, reduced project costs and disputes in that order of significance. It is hoped that the results of the study may be useful in raising awareness about unethical practices and required prevention strategies, and assist in the development of necessary policies and guidelines for the introduction of mandatory technical auditing on publicly funded construction projects in Zambia and elsewhere.
700 1 _aMUYA, M.
_939168
700 1 _aSHAKANTU, W.
_939169
700 1 _aKALIBA, C.
_939170
773 0 8 _tInternational Journal of Project Management
_g27, 8, p. 821-832
_dExeter, UK : Elsevier, November 2009
_xISSN 02637863
_w
942 _cS
998 _a20100324
_b1050^b
_cDaiane
998 _a20100326
_b1046^b
_cCarolina
999 _aConvertido do Formato PHL
_bPHL2MARC21 1.1
_c32086
_d32086
041 _aeng