000 02412naa a2200205uu 4500
001 0032511095237
003 OSt
005 20190211170706.0
008 100325s2009 xx ||||gr |0|| 0 eng d
100 1 _aKALIBA, Chabota
_939232
245 1 0 _aCost escalation and schedule delays in road construction projects in Zambia
260 _aExeter, UK :
_bElsevier,
_cJuly 2009
520 3 _aThe wealth of any nation is gauged by its performance in infrastructure provision through its construction industry. The construction industry is large, volatile, and requires tremendous capital outlays. For developing economies, road construction constitutes a major component of the construction industry. This means that much of the national budget on infrastructure development is channelled to road construction projects. The aim of the study reported in this paper was to identify causes and effects of cost escalation and schedule delays in road construction projects. Using a detailed literature review, structured interviews and questionnaire surveys, the results of the study confirmed the prevalence of cost escalation and schedule delays in road construction projects in Zambia. The study established that bad or inclement weather due to heavy rains and floods, scope changes, environmental protection and mitigation costs, schedule delay, strikes, technical challenges, inflation and local government pressures were the major causes of cost escalation in Zambia’s road construction projects. On the other hand, delayed payments, financial processes and difficulties on the part of contractors and clients, contract modification, economic problems, materials procurement, changes in drawings, staffing problems, equipment unavailability, poor supervision, construction mistakes, poor coordination on site, changes in specifications and labour disputes and strikes were found to be the major causes of schedule delays in road construction projects. Appropriate project management practices are thus required to curb the causes and effects of cost escalation and schedule delays in road construction projects.
700 1 _aMUYA, Mundia
_939233
700 1 _aMUNBA, Kanyuka
_939234
773 0 8 _tInternational Journal of Project Management
_g27, 5, p. 522-531
_dExeter, UK : Elsevier, July 2009
_xISSN 02637863
_w
942 _cS
998 _a20100325
_b1109^b
_cDaiane
998 _a20100326
_b1101^b
_cCarolina
999 _aConvertido do Formato PHL
_bPHL2MARC21 1.1
_c32120
_d32120
041 _aeng