000 01810naa a2200241uu 4500
001 7346
003 OSt
005 20190211154241.0
008 020927s2005 xx ||||gr |0|| 0 eng d
100 1 _aGHOMI, S.M.T. Fartemi
_94043
245 1 0 _aA simulation model for multi-project resource allocation
260 _c2002
520 3 _aThere are limited solution techniques available for resource constrained single project sheduling with stochastic task durations. Due to computacional complexity, optimal solution or heuristics for sheduling have been found useful for large deterministic problems. This complexity is more and more for common resource constraint with multi-projects (parallel projects). The main objective of this problem is sheduling the projects as soon as possible with better utilization of common available resource constraint. This paper considers the problem of multi-project resource allocation (MPRA) as a multi-channel queuing system. Simulation modelling has been used to solve the MPRA problem. This paper demonstartes a framework and a procedure with use of a general purpose simulation language like GPSS's blocks to generate a simulation model. Then to show how to model works, a numerical example is given and statistical results are recorded. The model has the capability to obtain the complection time distribution function for each project, througput time (makespan) and consumed resource distribution
650 4 _aResource Allocation
_912604
650 4 _aScheduling Projects
_916841
650 4 _aSimulation Modelling
_916842
650 4 _aMulti-project
_916843
700 1 _aASHJARI, B
_916844
773 0 8 _tInternational Journal of Project Management
_g20, 2, p. 127-130
_d, 2002
_w
942 _cS
998 _a20020927
_bLucima
_cLucimara
998 _a20060515
_b1444^b
_cQuiteria
999 _aConvertido do Formato PHL
_bPHL2MARC21 1.1
_c7499
_d7499
041 _aeng