000 | 01550naa a2200205uu 4500 | ||
---|---|---|---|
001 | 8958 | ||
003 | OSt | ||
005 | 20190211154607.0 | ||
008 | 021204s2005 xx ||||gr |0|| 0 eng d | ||
100 | 1 |
_aKAMARA, John M _95392 |
|
245 | 1 | 0 | _aAssessing the suitability of current briefing practices in construction within a concurrent engineering framework |
260 | _c2001 | ||
520 | 3 | _aConcurrent engineering (CE) is seen as a key to the integration of the construction process. Its implementation in the construction industry requires an adequate assessment of existing practices within the industry to determine the kind of processes and tools that need to be developed. This paper focuses on the briefing stage in the construction process, which is used to elicit and represent client objectives for project, and assesses whether the current practice of briefing is adequate within a CE framework for design and construction. Using case studies and an industry survey, the current process of briefing was assessed against pre-defined requirements for briefing within a CE context. It was established that current practices are not adequate, and the paper therefore concludes with recommendations on the development of a suitable methodology for briefing within a CE framework | |
700 | 1 |
_aANUMBA, Chimay J _916872 |
|
700 | 1 |
_aEVBUOMWAN, Nosa F.O _918242 |
|
773 | 0 | 8 |
_tInternational Journal of Project Management _g19, 6, p. 337-351 _d, 2001 _w |
942 | _cS | ||
998 |
_a20021204 _bCassio _cCassio |
||
998 |
_a20060718 _b1425^b _cQuiteria |
||
999 |
_aConvertido do Formato PHL _bPHL2MARC21 1.1 _c9103 _d9103 |
||
041 | _aeng |