Research on project selection system of pre-evaluation of engineering design project bidding (Record no. 32105)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01750naa a2200205uu 4500 |
001 - CONTROL NUMBER | |
control field | 0032510115637 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | OSt |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20190211170652.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 100325s2009 xx ||||gr |0|| 0 eng d |
999 ## - SYSTEM CONTROL NUMBERS (KOHA) | |
Koha Dewey Subclass [OBSOLETE] | PHL2MARC21 1.1 |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | eng |
100 1# - MAIN ENTRY--PERSONAL NAME | |
Personal name | WANG, Jin |
9 (RLIN) | 39200 |
245 10 - TITLE STATEMENT | |
Title | Research on project selection system of pre-evaluation of engineering design project bidding |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Exeter, UK : |
Name of publisher, distributor, etc. | Elsevier, |
Date of publication, distribution, etc. | August 2009 |
520 3# - SUMMARY, ETC. | |
Summary, etc. | It is a significant security to select proper engineering design project to participate in bidding to increase the rate of wining a bid. At the pre-evaluation phase of design project bidding, the survey and design enterprise must complete the selection decision in two steps, that is bid/no-bid and which project to bid. Based on the systemic thinking and stakeholder theory, this paper sets up the criteria system for bid/no-bid decision and the index system for which project to bid, and then constructs respectively the evaluation models with the logical valuation method and Grey Target method. Conclusion: the establishment of design projects bidding selection systems should manage to realize the benefits equilibrium between stakeholders, considering the different interests requirement from different interests groups. It could simultaneously satisfy the two-step requirements at pre-evaluation phase assuring the decision to be not only scientific but also practical, so as to enhance the management level of design projects. |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | XU, Yujie |
9 (RLIN) | 39201 |
700 1# - ADDED ENTRY--PERSONAL NAME | |
Personal name | LI, Zhun |
9 (RLIN) | 39202 |
773 08 - HOST ITEM ENTRY | |
Title | International Journal of Project Management |
Related parts | 27, 6, p. 584-559 |
Place, publisher, and date of publication | Exeter, UK : Elsevier, August 2009 |
International Standard Serial Number | ISSN 02637863 |
Record control number | |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Periódico |
998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
-- | 20100325 |
Operator's initials, OID (RLIN) | 1011^b |
Cataloger's initials, CIN (RLIN) | Daiane |
998 ## - LOCAL CONTROL INFORMATION (RLIN) | |
-- | 20100326 |
Operator's initials, OID (RLIN) | 1052^b |
Cataloger's initials, CIN (RLIN) | Carolina |
No items available.