<style type="text/css"> .wpb_animate_when_almost_visible { opacity: 1; }</style> Enap catalog › Details for: Research on project selection system of pre-evaluation of engineering design project bidding
Normal view MARC view ISBD view

Research on project selection system of pre-evaluation of engineering design project bidding

By: WANG, Jin.
Contributor(s): XU, Yujie | LI, Zhun.
Material type: materialTypeLabelArticlePublisher: Exeter, UK : Elsevier, August 2009International Journal of Project Management 27, 6, p. 584-559Abstract: It is a significant security to select proper engineering design project to participate in bidding to increase the rate of wining a bid. At the pre-evaluation phase of design project bidding, the survey and design enterprise must complete the selection decision in two steps, that is “bid/no-bid” and “which project to bid”. Based on the systemic thinking and stakeholder theory, this paper sets up the criteria system for “bid/no-bid decision” and the index system for “which project to bid”, and then constructs respectively the evaluation models with the logical valuation method and Grey Target method. Conclusion: the establishment of design projects’ bidding selection systems should manage to realize the benefits equilibrium between stakeholders, considering the different interests requirement from different interests groups. It could simultaneously satisfy the two-step requirements at pre-evaluation phase assuring the decision to be not only scientific but also practical, so as to enhance the management level of design projects.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
No physical items for this record

It is a significant security to select proper engineering design project to participate in bidding to increase the rate of wining a bid. At the pre-evaluation phase of design project bidding, the survey and design enterprise must complete the selection decision in two steps, that is “bid/no-bid” and “which project to bid”. Based on the systemic thinking and stakeholder theory, this paper sets up the criteria system for “bid/no-bid decision” and the index system for “which project to bid”, and then constructs respectively the evaluation models with the logical valuation method and Grey Target method. Conclusion: the establishment of design projects’ bidding selection systems should manage to realize the benefits equilibrium between stakeholders, considering the different interests requirement from different interests groups. It could simultaneously satisfy the two-step requirements at pre-evaluation phase assuring the decision to be not only scientific but also practical, so as to enhance the management level of design projects.

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Escola Nacional de Administração Pública

Escola Nacional de Administração Pública

Endereço:

  • Biblioteca Graciliano Ramos
  • Funcionamento: segunda a sexta-feira, das 9h às 19h
  • +55 61 2020-3139 / biblioteca@enap.gov.br
  • SPO Área Especial 2-A
  • CEP 70610-900 - Brasília/DF
<
Acesso à Informação TRANSPARÊNCIA

Powered by Koha